Manajer Pelaksana Konstruksi Sistem Produksi Air Minum (SPAM) (SI112001)
Jenis Skema : Okupasi
Jenjang (Level) : 6
Construction Manager for Water Supply Production System (SPAM) (Code : SI112001)
Unit Kompetensi:
Kode Unit : F.422120.001.01
Menerapkan Peraturan Perundang-undangan Jasa Konstruksi, Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3), Pengendalian Lingkungan Kerja dan Mutu
Implementing Construction Services Laws and Regulations, Occupational Safety and Health Management System (SMK3), Work Environment and Quality Control
Kode Unit : F.422120.002.01
Menganalisis Dokumen Kontrak
Analyzing Contract Documents
Kode Unit : F.422120.003.01
Mempersiapkan Pelaksanaan Konstruksi Sistem Produksi Air Minum
Preparing for the Implementation of the Construction of the Drinking Water Production System
Kode Unit : F.422120.004.01
Melaksanakan Pekerjaan Konstruksi Sistem Produksi Air Minum
Carrying out Drinking Water Production System Construction Work
Kode Unit : F.422120.005.01
Mengendalikan Pelaksanaan Pekerjaan Konstruksi Sistem Produksi Air Minum
Controlling the Implementation of Drinking Water Production System Construction Work
Kode Unit : F.422120.006.01
Melaksanakan Tes Komisioning dan Serah Terima Pekerjaan
Carrying out Commissioning Tests and Handover of Work
Kode Unit : F.422120.007.01
Membuat Laporan Akhir Pelaksanaan Pekerjaan Konstruksi Sistem Produksi Air Minum
Making Final Report on the Implementation of Drinking Water Production System Construction Work