Ahli Muda Pengukuran Jalan (SI161003)
Jenis Skema : Okupasi
Jenjang (Level) : 7
Junior Expert in Road Measurement (Code : SI161003)
Unit Kompetensi:
Kode Unit : M.711000.001.01
Mengelola Penerapan Ketentuan Undang-Undang Jasa Konstruksi (UUJK), Etos Kerja, Sistem Manajemen Keselamatan Kesehatan Kerja dan Lingkungan (SMK3L) dan Sistem Manajemen Mutu (SMM)
Managing the Implementation of the Provisions of the Construction Services Law (UUJK), Work Ethic, Occupational Health and Environmental Safety Management System (SMK3L) and Quality Management System (SMM)
Kode Unit : M.711000.002.01
Mengelola Survei Pendahuluan (Reconnaisance) Sebelum Survei Detil Lainnya untuk Penetapan Trase Jalan
Managing Preliminary Surveys (Reconnaisance) Before Other Detailed Surveys for Road Trase Determination
Kode Unit : M.711000.003.01
Mengelola Survei Topografi untuk Tahap Perencanaan Geometrik Jalan
Managing Topographic Surveys for the Road Geometric Planning Stage
Kode Unit : M.711000.004.01
Mengelola Pembuatan Peta Topografi/Peta Planimetri untuk Tahap Perencanaan Geometrik Jalan
Managing Topographic Mapping/Planimetri Maps for the Road Geometric Planning Stage
Kode Unit : M.711000.005.01
Mengelola Persiapan Pengukuran dan Pematokan (Stake Out) Pekerjaan Jalan Sesuai Desain Geometrik
Managing the Preparation of Measurement and Benchmarking (Stake Out) of Road Works According to Geometric Design
Kode Unit : M.711000.006.01
Mengelola Hasil Pengukuran dan Pematokan (Stake Out) Pekerjaan Jalan Sesuai Desain Geometrik di Lapangan (Pengukuran Profil Memanjang dan Melintang)
Managing the Results of Measurement and Stake Out of Roadworks According to Geometric Design in the Field (Longitudinal and Horizontal Profile Measurements)
Kode Unit : M.711000.007.01
Mengelola Hasil Pengukuran untuk Perhitungan Volume Hasil Pelaksanaan Pekerjaan Jalan pada Setiap Tahap
Managing Measurement Results for Calculation of Volume of Results of Execution of Road Works at Each Stage
Kode Unit : M.711000.008.01
Mengelola Hasil Pengukuran Bersama (Mutual Check) Sepanjang Trase Jalan yang Telah Dibangun
Managing Mutual Check Results Along the Road Trase That Has Been Built
Kode Unit : M.711000.009.01
Mengelola Pelaporan Hasil Pekerjaan Pengukuran Jalan
Managing the Reporting of Road Measurement Work Results