Ahli Madya Teknik Dermaga (SI191003)
Jenis Skema : Okupasi
Jenjang (Level) : 8
Associate Expert of Pier Engineering (Code : SI191003)
Unit Kompetensi:
Kode Unit : F.429120.001.01
Menerapkan Komunikasi di Tempat Kerja
Implementing Communication in the Workplace
Kode Unit : F.429120.002.01
Menyiapkan Data Sekunder yang Terkait dengan Perencanaan Dermaga
Preparing Secondary Data Related to Dock Planning
Kode Unit : F.429120.004.01
Mendesain Lay Out Dermaga
Designing Pier Lay Out
Kode Unit : F.429120.005.01
Melaksanakan Survei Penyelidikan Tanah
Conducting Soil Research Surveys
Kode Unit : F.429120.008.01
Melakukan Perhitungan Detail Desain Struktur Dermaga
Performing Detailed Calculations of Pier Structure Design
Kode Unit : F.429120.009.01
Mengkaji Hasil Perhitungan Struktur Dermaga
Examining the Results of Calculation of Pier Structure
Kode Unit : F.429120.010.01
Membuat Gambar Rencana Dermaga
Making a Dock Plan Drawing
Kode Unit : F.429120.011.01
Membuat Desain Final Dermaga
Creating the Final Design of the Pier
Kode Unit : F.429120.012.01
Mengkaji Gambar Detail dan Pembuatan Desain Final Konstruksi Dermaga
Reviewing Detailed Drawings and Making the Final Design of Pier Construction
Kode Unit : F.429120.013.01
Membuat Laporan dan Dokumentasi Pekerjaan
Creating Reports and Documentation of Work
Kode Unit : F.429120.014.01
Melaksanakan Pekerjaan K3LM (K3, Lingkungan dan Sistem Manajemen Mutu)
Carrying out K3LM Work (K3, Environment and Quality Management System)
Kode Unit : F.429120.016.01
Membuat Program Kerja dan Metode Kerja
Creating Work Programs and Work Methods
Kode Unit : F.429120.018.01
Mengelola Keuangan dan Sumber Daya Manusia
Managing Finance and Human Resources
Kode Unit : F.429120.019.01
Mengelola Administrasi Teknik
Managing Engineering Administration
Kode Unit : F.429120.007.01
Melaksanakan Pekerjaan Persiapan Perencanaan Detail Dermaga
Carrying out Pier Detailed Planning Preparation Work
Kode Unit : F.429120.017.01
Melaksanakan Pekerjaan Persiapan Konstruksi Dermaga
Carrying out Pier Construction Preparation Work
Kode Unit : F.429120.020.01
Mengendalikan Pelaksanaan Pekerjaan Tanah
Controlling the Implementation of Earthworks
Kode Unit : F.429120.021.01
Mengendalikan Pelaksanaan Pekerjaan Beton
Controlling the Implementation of Concrete Works
Kode Unit : F.429120.022.01
Mengendalikan Pelaksanaan Pekerjaan Pemancangan
Controlling the Implementation of Hoisting Jobs
Kode Unit : F.429120.023.01
Mengendalikan Pelaksanaan Pekerjaan Asesoris Dermaga
Controlling the Implementation of Dock Accessory Work
Kode Unit : F.429120.024.01
Melakukan Pengendalian Biaya, Mutu dan Waktu
Controlling Cost, Quality and Time
Kode Unit : F.429120.025.01
Melakukan Proses Serah Terima Pekerjaan
Conducting the Work Handover Process
Kode Unit : F.429120.026.01
Memeriksa Kesiapan Kontraktor untuk Memulai Pelaksanaan Pekerjaan
Checking the Contractor`s Readiness to Commence Work Execution
Kode Unit : F.429120.015.01
Mengkaji Dokumen Kontrak
Reviewing Contract Documents
Kode Unit : F.429120.027.01
Melakukan Supervisi Pelaksanaan Pekerjaan Tanah pada Konstruksi Dermaga
Supervise the Implementation of Earthworks on Dock Construction
Kode Unit : F.429120.028.01
Melakukan Supervisi Pelaksanaan Pekerjaan Beton pada Konstruksi Dermaga
Supervising the Implementation of Concrete Work on Pier Construction
Kode Unit : F.429120.029.01
Melakukan Supervisi Pelaksanaan Pekerjaan Pemancangan pada Konstruksi Dermaga
Supervising the Implementation of Hoisting Work on Pier Construction
Kode Unit : F.429120.030.01
Melakukan Supervisi Pelaksanaan Pekerjaan Asesoris Dermaga
Supervising the Implementation of Pier Accessory Work
Kode Unit : F.429120.031.01
Melakukan Pengawasan Mutu, Kuantitas dan Waktu
Conducting Quality, Quantity and Time Controls
Kode Unit : F.429120.032.01
Mengevaluasi Kinerja Kontraktor
Evaluating Contractor Performance
Kode Unit : F.429120.033.01
Melakukan Pengukuran Bersama untuk Penerbitan Sertifikat Pembayaran
Performing Joint Measurements for Payment Certificate Issuance
Kode Unit : F.429120.034.01
Membuat Laporan Pekerjaan Supervisi
Creating a Supervision Job Report