Ahli Teknik Bendungan Besar (SI071002)
Jenis Skema : Okupasi
Jenjang (Level) : 9
Large Dam Engineering Expert (Code : SI071002)
Unit Kompetensi:
Kode Unit : F.429110.001.01
Menerapkan Peraturan-Peraturan Pembangunan Bendungan Besar
Implementing the Regulations for the Construction of Large Dams
Kode Unit : F.429110.002.01
Menerapkan Komunikasi di Tempat Kerja
Implementing Communication in the Workplace
Kode Unit : F.429110.003.01
Menyiapkan Data Sekunder Perencanaan Bendungan Besar
Preparing Secondary Data for Large Dam Planning
Kode Unit : F.429110.004.01
Menyiapkan Data Primer Perencanaan Bendungan Besar
Preparing Primary Data for Large Dam Planning
Kode Unit : F.429110.005.01
Mengembangkan Alternatif Pembangunan Bendungan Besar
Developing Alternatives to Large Dam Construction
Kode Unit : F.429110.006.01
Melakukan Analisis Hidrologi
Conducting a Hydrological Analysis
Kode Unit : F.429110.007.01
Membuat Desain Pendahuluan Bendungan Besar
Making a Preliminary Design of a Large Dam
Kode Unit : F.429110.008.01
Mengkaji Hasil Desain Pendahuluan Bendungan Besar
Examining the Results of the Preliminary Design of Large Dams
Kode Unit : F.429110.009.01
Menyiapkan Perhitungan Volume dan Biaya Pembangunan Bendungan Besar
Preparing Calculations of the Volume and Cost of Large Dam Construction
Kode Unit : F.429110.010.01
Melakukan Evaluasi Kelayakan Proyek
Conducting Project Feasibility Evaluations
Kode Unit : F.429110.011.01
Menyiapkan Kerangka Acuan Kerja Untuk Desain Rinci Bendungan Besar
Preparing a working frame of reference for the detailed design of a large dam
Kode Unit : F.429110.012.01
Menyiapkan Investigasi Rinci
Setting Up a Detailed Investigation
Kode Unit : F.429110.013.01
Membuat Desain Rinci Bendungan Besar
Making a Detailed Design of a Large Dam
Kode Unit : F.429110.014.01
Mengkaji Hasil Desain Rinci Bendungan Besar
Examining the Detailed Design Results of Large Dams
Kode Unit : F.429110.015.01
Membuat Laporan dan Dokumentasi Pekerjaan
Creating Reports and Documentation of Work
Kode Unit : F.429110.016.01
Melaksanakan Pekerjaan K3LM, (K3, Lingkungan dan Sistem Manajemen Mutu)
Carrying out K3LM work, (K3, Environment and Quality Management System)
Kode Unit : F.429110.017.01
Mengkaji Dokumen Kontrak
Reviewing Contract Documents
Kode Unit : F.429110.018.01
Membuat Program Kerja dan Metode Kerja
Creating Work Programs and Work Methods
Kode Unit : F.429110.019.01
Melaksanakan Pekerjaan Persiapan Konstruksi Bendungan Besar
Carrying out Preparatory Work for the Construction of a Large Dam
Kode Unit : F.429110.020.01
Mengelola Keuangan dan Sumber Daya Manusia
Managing Finance and Human Resources
Kode Unit : F.429110.021.01
Mengelola Administrasi Teknik
Managing Engineering Administration
Kode Unit : F.429110.022.01
Melaksanakan Pekerjaan Logistik dan Peralatan
Carrying out Logistics and Equipment Work
Kode Unit : F.429110.023.01
Mengendalikan Pelaksanaan Pekerjaan Bangunan Pengelak
Controlling the Implementation of Avoidance Building Work
Kode Unit : F.429110.024.01
Mengendalikan Pelaksanaan Pekerjaan Galian Pondasi
Controlling the Implementation of Foundation Excavation Work
Kode Unit : F.429110.025.01
Mengendalikan Pelaksanaan Pekerjaan Perbaikan Pondasi
Controlling the Implementation of Foundation Repair Work
Kode Unit : F.429110.026.01
Mengendalikan Pelaksanaan Pekerjaan Urugan Tubuh Bendungan
Controlling the Implementation of Dam Body Repair Work
Kode Unit : F.429110.027.01
Mengendalikan Pelaksanaan Pekerjaan Beton
Controlling the Implementation of Concrete Works
Kode Unit : F.429110.028.01
Mengendalikan Pelaksanaan Pekerjaan Pemasangan Instrumentasi
Controlling the Implementation of Instrumentation Installation Work
Kode Unit : F.429110.029.01
Mengendalikan Pelaksanaan Pekerjaan Bendungan Beton
Controlling the Implementation of Concrete Dam Works
Kode Unit : F.429110.030.01
Mengendalikan Pelaksanaan Pekerjaan blasting
Controlling the Implementation of Blasting Work
Kode Unit : F.429110.031.01
Mengendalikan Pelaksanaan Pekerjaan Hydromechanical
Controlling the Implementation of Hydromechanical Work
Kode Unit : F.429110.032.01
Melakukan Pengendalian Biaya, Mutu, dan Waktu
Controlling Cost, Quality, and Time
Kode Unit : F.429110.033.01
Melaksanaan Pekerjaan Pengisian Awal Waduk
Carrying out the Initial Filling of the Reservoir
Kode Unit : F.429110.034.01
Melakukan Serah Terima Pekerjaan
Carrying out the handover of work
Kode Unit : F.429110.035.01
Memeriksa Kesiapan Kontraktor untuk Memulai Pelaksanaan Pekerjaan
Checking the Contractor`s Readiness to Commence Work Execution
Kode Unit : F.429110.036.01
Melakukan Supervisi Pelaksanaan Pekerjaan Bangunan Pengelak
Supervising the Implementation of Avoidance Building Work
Kode Unit : F.429110.037.01
Melakukan Supervisi Pelaksanaan Pekerjaan Galian Pondasi
Supervising the Implementation of Foundation Excavation Work
Kode Unit : F.429110.038.01
Melakukan Supervisi Pelaksanaan Pekerjaan Perbaikan pondasi
Supervising the Implementation of Foundation Repair Work
Kode Unit : F.429110.039.01
Melakukan Supervisi Pelaksanaan Pekerjaan Urugan Tubuh Bendungan
Supervising the Implementation of Dam Body Repair Work
Kode Unit : F.429110.040.01
Melakukan Supervisi Pelaksanaan Pekerjaan beton
Supervising the Implementation of Concrete Works
Kode Unit : F.429110.041.01
Melakukan Supervisi Pelaksanaan Pekerjaan Pemasangan Instrumentasi
Supervising the Implementation of Instrumentation Installation Work
Kode Unit : F.429110.042.01
Melakukan Supervisi Pelaksanaan Pekerjaan Bendungan Beton
Supervising the Implementation of Concrete Dam Work
Kode Unit : F.429110.043.01
Melakukan Supervisi Pelaksanaan Pekerjaan Blasting
Supervising the Implementation of Blasting Work
Kode Unit : F.429110.044.01
Melakukan Supervisi Pelaksanaan Pekerjaan Hydromechanical
Supervising the Implementation of Hydromechanical Work
Kode Unit : F.429110.045.01
Melakukan Pengawasan Sistem Manajemen Mutu, Kuantitas dan Waktu
Conducting Quality, Quantity and Time Management System Supervision
Kode Unit : F.429110.046.01
Mengevaluasi Kinerja Kontraktor
Evaluating Contractor Performance
Kode Unit : F.429110.047.01
Melakukan Pengukuran Bersama untuk Penerbitan Sertifikat Pembayaran
Performing Joint Measurements for Payment Certificate Issuance
Kode Unit : F.429110.048.01
Membuat Laporan Pekerjaan Supervisi
Creating a Supervision Job Report
Kode Unit : F.429110.049.01
Melakukan Supervisi Pelaksanaan Pekerjaan Pengisian Awal Waduk
Supervising the Implementation of Reservoir Initial Filling Work
Kode Unit : F.429110.050.01
Melakukan Penyerahan Akhir Pekerjaan
Performing the Final Submission of Work