Ahli Utama Teknik Jalan - SI031022 (SI031022)
Jenis Skema : Okupasi
Jenjang (Level) : 9
(Code : SI031022)
Unit Kompetensi:
Kode Unit : F.42ATJ00.002.2
Melaksanakan Pekerjaan Pengumpulan Data
Performing Data Collection Work
Kode Unit : F.42ATJ00.003.2
Melaksanakan Studi Kelaikan dan Lingkungan
Conducting a Feasibility and Environmental Study
Kode Unit : F.42ATJ00.004.2
Melaksanakan Pekerjaan Perencanaan Geometrik Jalan
Carrying out road geometric planning work
Kode Unit : F.42ATJ00.005.2
Melaksanakan Pekerjaan Rekayasa Lalu Lintas
Carry out traffic engineering work
Kode Unit : F.42ATJ00.006.2
Melaksanakan Pekerjaan Rekayasa Geoteknik
Carry out Geotechnical Engineering Work
Kode Unit : F.42ATJ00.007.2
Melaksanakan Pekerjaan Perencanaan Perkerasan Jalan
Carrying out road pavement planning work
Kode Unit : F.42ATJ00.008.2
Melaksanakan Pekerjaan Perencanaan Drainase
Carrying out drainage planning work
Kode Unit : F.42ATJ00.009.2
Melaksanakan Pekerjaan Perencanaan Dinding Penahan Tanah dan Dinding Pelindung Lereng
Carrying out Soil Retaining Wall and Slope Protective Wall Planning Work
Kode Unit : F.42ATJ00.010.2
Melaksanakan Pekerjaan Perencanaan Bangunan Pelengkap Jalan
Carrying out road complementary building planning work
Kode Unit : F.42ATJ00.011.2
Menyiapkan Dokumen Pengadaan
Preparing Procurement Documents
Kode Unit : F.42ATJ00.012.2
Melakukan Pelaksanaan Pekerjaan Persiapan Konstruksi Jalan
Carrying out road construction preparation work
Kode Unit : F.42ATJ00.013.2
Melaksanakan Kegiatan Administrasi Pelaksanaan Konstruksi Jalan
Carrying out administrative activities for the implementation of road construction
Kode Unit : F.42ATJ00.014.2
Melaksanakan Pekerjaan Drainase
Carrying out drainage work
Kode Unit : F.42ATJ00.015.2
Melaksanakan Pekerjaan Tanah dan Geosintetik
Performing Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.016.2
Melaksanakan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carrying out Granular Pavement and Cement Concrete Pavement Work
Kode Unit : F.42ATJ00.017.2
Melaksanakan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.018.2
Melakukan Pekerjaan Preventif Pelaksanaan Pekerjaan Jalan
Doing Preventive Work for the Implementation of Road Works
Kode Unit : F.42ATJ00.019.2
Melaksanakan Pekerjaan Struktur Jalan
Carrying out road structure work
Kode Unit : F.42ATJ00.020.2
Melaksanakan Pekerjaan Harian dan Pekerjaan Lain-lain
Performing Daily Work and Other Work
Kode Unit : F.42ATJ00.021.2
Melakukan Pengawasan Kegiatan Pekerjaan Persiapan Konstruksi Jalan
Supervising Road Construction Preparation Work Activities
Kode Unit : F.42ATJ00.022.2
Melaksanakan Pengawasan Kegiatan Administrasi Konstruksi Jalan
Carrying out supervision of road construction administration activities
Kode Unit : F.42ATJ00.023.2
Melaksanaan Pengawasan Pekerjaan Drainase
Carrying out drainage work supervision
Kode Unit : F.42ATJ00.024.2
Mengawasi Pelaksanaan Pekerjaan Tanah dan Geosintetik
Supervising the Implementation of Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.025.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carrying out Supervision of Grained Pavement and Cement Concrete Pavement Work
Kode Unit : F.42ATJ00.026.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out Supervision of Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.027.2
Mengawasi Pelaksanaan Pekerjaan Preventif Pekerjaan Jalan
Supervising the Implementation of Preventive Work of Road Works
Kode Unit : F.42ATJ00.028.2
Melaksanakan Pengawasan Pekerjaan Struktur Jalan
Carrying out supervision of road structure work
Kode Unit : F.42ATJ00.029.2
Mengawasi Pekerjaan Harian dan Pekerjaan lain-lain
Supervise Daily Work and Miscellaneous Work
Kode Unit : F.42ATJ00.001.2
Mengendalikan Pekerjaan Survei Pendahuluan (Reconnaissance Survey)
Controlling Preliminary Survey Work (Reconnaissance Survey)