Ahli Utama Teknik Perencanaan Irigasi Rawa - SI081017 (SI081017)
Jenis Skema : Okupasi
Jenjang (Level) : 9
(Code : SI081017)
Unit Kompetensi:
Kode Unit : M.711000.001.01
Menerapkan Keselamatan dan Kesehatan Kerja (K3)
Implementing Occupational Safety and Health (OSH)
Kode Unit : M.711000.002.01
Melakukan Komunikasi dengan Pihak Terkait
Communicating with Related Parties
Kode Unit : M.711000.003.01
Melakukan Pekerjaan Persiapan Perencanaan Irigasi Rawa
Doing Swamp Irrigation Planning Preparation Work
Kode Unit : M.711000.004.01
Melaksanakan Pengumpulan Data Sekunder dan Primer Irigasi Rawa
Carrying out Secondary and Primary Data Collection of Swamp Irrigation
Kode Unit : M.711000.005.01
Melakukan Analisis Kawasan Perencanaan Irigasi Rawa
Conducting an Analysis of Swamp Irrigation Planning Areas
Kode Unit : M.711000.006.01
Membuat Perencanaan Awal (Sistem Makro dan Mikro) Irigasi Rawa
Making Initial Planning (Macro and Micro Systems) for Swamp Irrigation
Kode Unit : M.711000.007.01
Membuat Perencanaan Terperinci (Detail Engineering Design) Irigasi Rawa
Making a Detailed Engineering Design for Swamp Irrigation
Kode Unit : M.711000.008.01
Membuat Panduan Rencana Operasi dan Pemeliharaan Irigasi Rawa
Creating a Guide to the Swamp Irrigation Operation and Maintenance Plan
Kode Unit : M.711000.009.01
Membuat Laporan Perencanaan Irigasi Rawa
Creating a Swamp Irrigation Planning Report