Ahli Utama Teknik Jalan (SI031020)
Jenis Skema : Okupasi
Jenjang (Level) : 9
Main Expert in Road Engineering (Code : SI031020)
Unit Kompetensi:
Kode Unit : F.42ATJ00.001.2
Mengendalikan Pekerjaan Survei Pendahuluan (Reconnaissance Survey)
Controlling the Preliminary Survey Work (Reconnaissance Survey)
Kode Unit : F.42ATJ00.002.2
Melaksanakan Pekerjaan Pengumpulan Data
Carrying out Data Collection Work
Kode Unit : F.42ATJ00.003.2
Melaksanakan Studi Kelaikan dan Lingkungan
Carrying out Feasibility and Environmental Studies
Kode Unit : F.42ATJ00.004.2
Melaksanakan Pekerjaan Perencanaan Geometrik Jalan
Carrying out Road Geometric Planning Work
Kode Unit : F.42ATJ00.007.2
Melaksanakan Pekerjaan Perencanaan Perkerasan Jalan
Carrying out Road Pavement Planning Work
Kode Unit : F.42ATJ00.008.2
Melaksanakan Pekerjaan Perencanaan Drainase
Carrying out Drainage Planning Work
Kode Unit : F.42ATJ00.009.2
Melaksanakan Pekerjaan Perencanaan Dinding Penahan Tanah dan Dinding Pelindung Lereng
Carrying out the Planning Work of Soil Retaining Walls and Slope Protection Walls
Kode Unit : F.42ATJ00.010.2
Melaksanakan Pekerjaan Perencanaan Bangunan Pelengkap Jalan
Carrying out Road Complementary Building Planning Work
Kode Unit : F.42ATJ00.011.2
Menyiapkan Dokumen Pengadaan
Preparing Procurement Documents
Kode Unit : F.42ATJ00.005.2
Melaksanakan Pekerjaan Rekayasa Lalu Lintas
Carrying out Traffic Engineering Work
Kode Unit : F.42ATJ00.006.2
Melaksanakan Pekerjaan Rekayasa Geoteknik
Carrying out Geotechnical Engineering Work
Kode Unit : F.42ATJ00.012.2
Melakukan Pelaksanaan Pekerjaan Persiapan Konstruksi Jalan
Carrying out Road Construction Preparation Work
Kode Unit : F.42ATJ00.013.2
Melaksanakan Kegiatan Administrasi Pelaksanaan Konstruksi Jalan
Carrying out Administrative Activities for the Implementation of Road Construction
Kode Unit : F.42ATJ00.014.2
Melaksanakan Pekerjaan Drainase
Carrying out Drainage Work
Kode Unit : F.42ATJ00.015.2
Melaksanakan Pekerjaan Tanah dan Geosintetik
Carrying out Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.016.2
Melaksanakan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carrying out Granular Pavement and Cement Concrete Pavement Work
Kode Unit : F.42ATJ00.017.2
Melaksanakan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.018.2
Melakukan Pekerjaan Preventif Pelaksanaan Pekerjaan Jalan
Carrying out Preventive Work for the Implementation of Road Works
Kode Unit : F.42ATJ00.019.2
Melaksanakan Pekerjaan Struktur Jalan
Carrying out Road Structure Work
Kode Unit : F.42ATJ00.020.2
Melaksanakan Pekerjaan Harian dan Pekerjaan Lain-lain
Performing Daily Work and Miscellaneous Work
Kode Unit : F.42ATJ00.021.2
Melakukan Pengawasan Kegiatan Pekerjaan Persiapan Konstruksi Jalan
Supervise Road Construction Preparation Work Activities
Kode Unit : F.42ATJ00.022.2
Melaksanakan Pengawasan Kegiatan Administrasi Konstruksi Jalan
Carry out supervision of road construction administrative activities
Kode Unit : F.42ATJ00.023.2
Melaksanaan Pengawasan Pekerjaan Drainase
Carrying out Supervision of Drainage Works
Kode Unit : F.42ATJ00.024.2
Mengawasi Pelaksanaan Pekerjaan Tanah dan Geosintetik
Supervising the Implementation of Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.025.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carry out Supervision of Grained Pavement and Cement Concrete Pavement Work
Kode Unit : F.42ATJ00.026.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out supervision of asphalt pavement work (Flexible Pavement)
Kode Unit : F.42ATJ00.027.2
Mengawasi Pelaksanaan Pekerjaan Preventif Pekerjaan Jalan
Supervising the Implementation of Preventive Work on Road Works
Kode Unit : F.42ATJ00.028.2
Melaksanakan Pengawasan Pekerjaan Struktur Jalan
Carry out supervision of road structure work
Kode Unit : F.42ATJ00.029.2
Mengawasi Pekerjaan Harian dan Pekerjaan lain-lain
Supervising Daily Work and Miscellaneous Work